
Solar Quotes Ekurhuleni: Home and Business Installed Prices
An Ekurhuleni home solar system costs about R85,000 to R180,000 installed; a business or factory system starts around R150,000 and scales with your daytime load. The City of Ekurhuleni is the East Rand metro that does pay for exported power - a registered SSEG customer earns a R1.05/kWh energy credit on what they feed back, all seasons. But self-consumption still saves more per unit, so size for your own load first.
Free, no obligation. Updated 5 October 2026.
- Fixed installed price, VAT included
- City of Ekurhuleni SSEG registration and the 4-quadrant meter you need to earn the export credit
- Sized for self-consumption first, export credit as a bonus
- An installer who works Ekurhuleni and the wider East Rand
How much is solar for an Ekurhuleni home?
A home system in East Rand suburbs like Benoni, Boksburg, Bedfordview, Edenvale and Kempton Park runs about R85,000 to R180,000 installed, depending on battery and array size. Ekurhuleni is the one Gauteng metro that pays for exported power: once you register your SSEG system and fit a 4-quadrant bi-directional meter, the City credits you R1.05/kWh for the surplus you feed back, all seasons. Even so, every unit you use yourself saves the full municipal rate - around R3.66/kWh on the City of Ekurhuleni embedded-generation tariff - which is worth far more than the export credit, so the system is sized to run your own load first. You must stay a net consumer (import more than you export over a month), and a Certificate of Compliance is required either way.

Your monthly electricity bill
Average across the last 3 months - load shedding skews single months.
What does commercial and factory solar cost in Ekurhuleni?
The East Rand is Gauteng's industrial and logistics heartland - Isando, Jet Park, Spartan, Sebenza, Wadeville, Alrode and Anderbolt, with the OR Tambo precinct on top - so a commercial installation here starts around R150,000 and scales hard with your daytime load. The return has three parts: the units you stop buying from the City, the R1.05/kWh export credit on genuine surplus once you run a 4-quadrant meter, and the Section 12B tax write-off - 100% of a solar PV system under 1 MW deducted in year one, worth about R27,000 of tax for every R100,000 spent at the standard company rate. Plants, warehouses and cold stores draw hard through the day, exactly when solar produces, so self-consumption is high and the export credit tops up what spills over. The system must belong to the business claiming the deduction; confirm your rate with your accountant.

Estimate your business solar saving and export credit payout
How does the business use power?
Electrical supply

Solar for an Ekurhuleni plant or factory
The East Rand industrial nodes - Isando, Jet Park, Spartan, Sebenza, Wadeville, Alrode and Anderbolt - run long or round-the-clock loads, so a larger array and often a battery or generator tie-in make sense, and heavy daytime use is exactly where self-consumption pays. Surplus feeds back for the R1.05/kWh City of Ekurhuleni credit once a 4-quadrant meter is fitted, provided you stay a net consumer. Register SSEG with CoE; roof and yard space, three-phase supply and any existing backup shape the design.
R450,000+ · 30-500 kVA · SSEG with CoE; 4-quadrant meter to earn the export credit

Solar for an Ekurhuleni warehouse or office
Warehousing, logistics and office loads around OR Tambo, Kempton Park and Germiston run through the trading day, exactly when solar produces, so self-consumption is high and payback is quick. A rooftop array keeps the lights, racking power, cold rooms and air conditioning running through the City of Ekurhuleni tariff hikes, surplus earns the R1.05/kWh export credit, and the Section 12B write-off lands in year one.
From ~R150,000 · 10-30 kWp · Section 12B year one · export credit on surplus

Can you put solar on an East Rand building you lease?
Often yes, but it needs the landlord on side, because the panels fix to a roof you do not own - and on the East Rand that roof is often a leased factory or warehouse. The routes that work are a landlord-funded system, a tenant-funded system on a lease long enough to pay it back, or a shared arrangement. Two points matter here: the Section 12B deduction goes to whoever owns the system, so a tenant who buys it outright can claim it while a tenant on a PPA or rental cannot; and the City of Ekurhuleni export credit and the SSEG registration sit with the metered account holder, so agree up front who registers and who keeps the credit. Tell us your remaining lease term and we will help you frame the proposal.
Ekurhuleni solar by segment, at a glance.
| Segment | Typical system | Installed price | What you get back | Key Ekurhuleni rule |
|---|---|---|---|---|
| Home | 4-10 kW + battery | R85,000 - R180,000 | Self-consumption saving (~R3.66/kWh) + R1.05/kWh export credit on surplus | SSEG + 4-quadrant meter to earn the credit; stay a net consumer; CoC either way |
| Warehouse / office | 10-30 kWp | R150,000 - R450,000 | Daytime saving + export credit + Section 12B 100% write-off | Register SSEG; 4-quadrant meter; net-consumer rule |
| Factory / manufacturing | 30-500 kVA | R450,000 - R2,500,000+ | Load saving + export credit on surplus + Section 12B | SSEG with CoE; large daytime load favours self-consumption |
| Tenant / leased | Varies | Shared / landlord-funded | Bill saving split per the lease deal | Needs landlord consent, lease term, and who holds the SSEG account |
Estimates for 2026, Ekurhuleni / East Rand. Prices include equipment, labour, Certificate of Compliance and VAT; Section 12B is a tax deduction, not a cash grant. The City of Ekurhuleni pays a R1.05/kWh energy credit for exported power, all seasons, for registered SSEG customers on a 4-quadrant meter who stay net consumers. Your installer quote is fixed to your roof, load and tariff.
Credential-checked solar installers in Ekurhuleni · Get a free solar quote on EnergyBee
What is your average monthly electricity bill?
Pick a band and we size a system to it, then you compare quotes for your roof and suburb. No obligation.
The local facts your quote turns on.
Figures verified 5 October 2026 against the City of Ekurhuleni Schedule 2 tariffs. The City reviews SSEG rules and tariffs each year, so recheck before you sign.
Ekurhuleni pays for export
The City of Ekurhuleni compensates a registered SSEG customer with an energy credit of R1.0538/kWh for power exported to its grid, all seasons, under an offset/credit model (Schedule 2 2025/26). This is the differentiator from the rest of Gauteng - but you must register, fit a 4-quadrant meter and stay a net consumer to earn it.
Self-consumption saves more
A solar home moves onto the City of Ekurhuleni embedded-generation tariff, where imported units cost about R3.66/kWh (plus a fixed monthly charge). Every unit your solar offsets saves that full rate - roughly 3.5x the R1.05/kWh export credit - so the system is sized to run your own load first, with export a bonus on genuine surplus.
The meter you must fit
A 4-quadrant bi-directional Automated Meter Reading meter is the only accepted means to measure the units you export, and fitting it is a condition of earning the credit. Registration and compliance with the City of Ekurhuleni Embedded Generation Policy are mandatory before you grid-tie.
Stay a net consumer
To qualify for the export credit you must remain a net consumer - importing more kWh from the grid than you export over the month. A non-exporting SSEG system is allowed too, but pays an SSEG support charge instead of earning the credit. The system is sized to your own load, not to sell surplus back wholesale.
East Rand Highveld yield
The East Rand sits on the Highveld at about 1,700 to 1,750 kWh per kWp a year. It is summer-rainfall: dry, sunny winters give the strongest output, with afternoon cloud and thunderstorms trimming summer production - the opposite of the winter-rainfall coast.
Section 12B (100%)
A business writes off 100% of a solar PV system under 1 MW in year one (1 MW+ is 50/30/20 over three years). The asset must belong to the claimant; there is no residential equivalent.
Sources & methodology
Most of Ekurhuleni is supplied by the City of Ekurhuleni, but parts of the East Rand are supplied directly by Eskom - check your bill, because it decides who you register your system with and whether the City export credit applies. Sources: City of Ekurhuleni Schedule 2 Electricity Tariffs 2025/26 (ekurhuleni.gov.za); the City of Ekurhuleni Annexure E25 Guideline for Embedded Generation; SARS Section 12B renewable-energy allowance. Verified 5 October 2026. The export energy credit (R1.0538/kWh, all seasons), the 4-quadrant meter requirement and the net-consumer rule are quoted against the City's own current schedule - confirm the exact rate and your supply authority before you sign.
What still gets checked, and what solar will not do.
Calculator figures are estimates. A site assessment confirms usable roof area, orientation, shading, the switchboard and the inverter position before any price is fixed.
Production peaks in winter. On the Highveld the dry, sunny winter is the strongest season, and output dips under summer afternoon cloud and thunderstorms - the opposite of the winter-rainfall coast.
Export pays, but self-consumption pays more. Ekurhuleni does credit you R1.05/kWh for exported power, but a unit you use yourself saves about R3.66/kWh, so size for your own load first and treat the export credit as a bonus on surplus - and you only earn it once you register, fit a 4-quadrant meter and stay a net consumer.
Section 12B is a tax deduction, not a cash rebate. The benefit depends on the business being profitable and is claimed through the tax return.
An apartment or flat is a backup-only enquiry (inverter and battery), not a rooftop array, because the roof is shared.
Areas we cover across Ekurhuleni.
We quote and install across Ekurhuleni and the wider East Rand, residential and commercial - the suburbs, the towns, and the industrial and logistics nodes (Isando, Jet Park, Spartan, Sebenza, Wadeville, Alrode, Anderbolt and the OR Tambo precinct). If your suburb, town or node is not listed, ask anyway:
Get a fixed installed price for your Ekurhuleni home, factory or business.
Free, no obligation. Tell us your segment and bill, and we then you compare quotes - City of Ekurhuleni SSEG registration, the 4-quadrant meter, fitment, the Certificate of Compliance, and the Section 12B numbers where they apply - from the installer who will do the work.
Ekurhuleni solar questions.
Does Ekurhuleni pay me for solar power I export to the grid?
Yes. The City of Ekurhuleni is the East Rand metro that compensates registered SSEG customers with an energy credit for power exported to its grid - R1.0538/kWh, about R1.05, all seasons on the 2025/26 Schedule 2 tariffs. It works as a credit against your bill rather than a cash payout, and you qualify only if you register your system under the City's Embedded Generation Policy, fit a 4-quadrant bi-directional meter, and stay a net consumer (importing more than you export over the month). A unit you use yourself still saves about R3.66/kWh, far more than the credit, so systems are sized to run your own load first.
What meter do I need to earn the Ekurhuleni export credit?
A 4-quadrant bi-directional Automated Meter Reading (AMR) meter. The City of Ekurhuleni treats it as the only accepted means to measure the units you export, so it is a condition of earning the R1.05/kWh credit. You also have to register the system under the City's Embedded Generation Policy and have a grid-tied or hybrid inverter with a Certificate of Compliance from a registered electrician. A non-exporting SSEG system is still allowed, but it pays an SSEG support charge instead of earning the credit.
How much does a solar system cost in Ekurhuleni?
A typical East Rand home system runs about R85,000 to R180,000 installed, depending on whether you add a battery and how big the array is. A small or light commercial installation starts around R150,000 and scales with your daytime load, with larger factory and warehouse systems running well into the hundreds of thousands or more. All prices include equipment, labour, the Certificate of Compliance and VAT, and your installer quote is fixed to your roof and usage.
Is solar worth it for an East Rand factory or warehouse?
Often strongly, because the East Rand is industrial and logistics country - Isando, Jet Park, Spartan, Wadeville, Alrode and the OR Tambo precinct - where plants, warehouses and cold stores draw hard right through the day, exactly when solar produces. That means high self-consumption at around R3.00 to R3.66/kWh saved, the R1.05/kWh City of Ekurhuleni export credit on genuine surplus, and the Section 12B tax write-off of 100% in year one for a business-owned system under 1 MW. Three-phase supply, roof and yard space and any existing generator shape the design, and the system must belong to the business claiming the deduction.
Is my area supplied by the City of Ekurhuleni or Eskom?
Most of Ekurhuleni is supplied by the City of Ekurhuleni, but parts of the East Rand are supplied directly by Eskom. Check your latest bill to see who you pay: it decides who you register your SSEG system with and whether the City of Ekurhuleni export credit applies to you. City-supplied customers register under the City's Embedded Generation Policy and can earn the credit on a 4-quadrant meter; Eskom-supplied properties register with Eskom instead, under Eskom's own rules.